hidden visitor counter
A-Z Index  |  Sitemap  |  Search  |  Contact
prevent.jpg
eSafety  EU Commission PReVENT Subprojects:
Print edition Print edition

D60.4 Validation plan


INSAFES

 

Confidential document

 

Abstract

The INSAFES Validation plan outlines the final evaluation tests and validation procedures.

The tests are designed to cover various INSAFES subsystems or units, different users, different context of use, etc, but the main focus lies on functional performance and usability.

 

The validation plan has been formulated following the methodology developed by the PReVAL SP and consists of the following three main parts:

  • Technical performance assessment
  • Human factors evaluation
  • Safety impact assessment.

The table below outlines for which functions the different evaluation/validation activities will be performed

 

INSAFES Functions

Technical validation

HF evaluation

Safety impact assessment

Demonstrator

Adaptive Lane Keeping Support with lateral monitoring

Volvo FH12 truck

 

Active Lane change warning with haptic steering wheel feedback and corrective action

Volvo FH12 truck

 

Enhancement of APALACI low speed obstacle warning

-

Volvo FH12 truck

 

Curve speed warning function

-

Volvo FH12 truck

 

All around monitoring (truck implementation)

-

Volvo FH12 truck

 

All around monitoring (car implementation)

-

-

Volvo S80

 

Integrated Longitudinal Support

-

FIAT Nuova Croma

All round collision warning

-

-

FIAT Nuova Croma

Manoeuvre suggestion

-

-

FIAT Nuova Croma

Warning Manager

-

Volvo S80


 


To the topTo the top

HORIZONTAL ACTIVITIES
RESPONSE 3
MAPS&ADAS
ProFusion1
ProFusion2
INSAFES
PReVAL
IP Exhibition
SAFE SPEED AND SAFE FOLLOWING
SASPENCE
WILLWARN
LATERAL SUPPORT
SAFELANE
LATERAL SAFE
INTERSECTION SAFETY
INTERSAFE
VULNERABLE ROAD USERS & COLLISION MITIGATION
APALACI
COMPOSE
UseRCams
© 2004. All rights reserved . Disclaimer This website is managed by ERTICO